Electrical Wiring and Connection
- Installation and connection of power cables, signal and power trays, equipotential networks.
- Installation and connection of instrumentation signals, As-i network cabling and connection of elements.
- Installation and connection of pneumatic tubing for valve actuation.
- Assembly of pneumatic valve blocks.
- Labelling of cables.
- Electrical testing on site.
Duration: 13 months
Location: Houten, Utrecht, The Netherlands