Carolina I+II Solar PowerPlant (10MW)
- Civil works: Trench for fenced cabling, foundations (Control Room and Transformers) and interior road.
- Mechanical work: Driving of piles. Assembly of structures, inverters and control room.
- Electrical work: Assembly of solar modules and DC String wiring, DC and AC wiring and electrical wiring in general. Supply and ground wiring and connections.
- Installation of CCTV system, weather station and lightning conductor.
- Testing.
Duration: 5 months
Location: Guadalajara, Spain